Department of Health, Disability and Ageing
FOI 25-0449 LD – Headspace Port Lincoln
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 27 Feb 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
This FOI release contains internal Department of Health correspondence and a headspace services relocation status report from January 2025. The documents discuss the relocation of headspace Port Lincoln, a youth mental health service in South Australia that was upgraded from a satellite to a full centre in 2023. The correspondence from July 2024 indicates a funding dispute between the Primary Health Network (PHN) and Local Area (LA) regarding underspends from the original centre upgrade, with the LA planning to purchase a new purpose-built site using its own funds and expecting the PHN to contribute remaining underspends. Establishment meetings were on hold as of March 2024 pending clarification of the funding situation. The January 2025 status report notes the relocation was on hold pending recommissioning, with an expected completion date of 30 June 2025 and no site yet identified.
Document text
7,040 characters extracted from 15 pages
The document text opens on its own page.