Department of Climate Change, Energy, the Environment and Water
Attachments To Caval Ridge Mine Horse Pit Extension, Bowen Basin Decision Brief - EPBC 2021/9031.
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 28 Feb 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
This disclosure contains emissions data and compliance information for the Caval Ridge Coal Mine Horse Pit Extension (EPBC 2021/9031). The project's life-of-mine greenhouse gas emissions total 271.08 Mt CO2-e, comprising 4.31 Mt from domestic Scope 1 operations, 1.21 Mt from Scope 2, and 265.56 Mt from Scope 3 (primarily combustion of exported coal). Annual emissions average 7.75 Mt CO2-e globally, representing 0.04% of Australia's 2020 emissions and 0.0156% of world emissions. A September 2024 environmental compliance check found no contraventions of national environmental law for the project operator (BM Alliance Coal Operations Pty Ltd and related entities), though the department noted inability to access historical compliance databases prior to September 2021.
Document text
10,003 characters extracted from 65 pages
The document text opens on its own page.