Department of Climate Change, Energy, the Environment and Water

Internal Review Of LEX 77481 - Compliance Report Of Coomera Connector Stage 1 - EPBC 2020/8646.

IR 77481 Released 120 pages PDF

Summary

AI-generated

Written by Claude Haiku 4.5 from the extracted text on 28 Feb 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

This is a compliance report for the Coomera Connector Stage 1 road project (EPBC 2020/8646) covering the period 17 March 2023 to 17 March 2024. Prepared by Queensland's Department of Transport and Main Roads, the document was signed by Regional Director Andrew Wheeler on 11 June 2024 under declaration that information provided is accurate under the EPBC Act. The report appears to be a formal compliance assessment against conditions imposed on the federally-approved project, though the excerpt provided does not contain substantive details about specific environmental conditions, biodiversity impacts, offset requirements, or compliance findings. The declaration indicates this is an official compliance notification to the Commonwealth regulator.

Document text

5,003 characters extracted from 120 pages

Open the PDF

The document text opens on its own page.