Department of Climate Change, Energy, the Environment and Water

Decision Brief And Recommendation Report For Eraring Battery Energy Storage System – EPBC 2021/8956.

82456 Released 17 pages PDF

Summary

AI-generated

Written by Claude Haiku 4.5 from the extracted text on 16 May 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

The Department of Agriculture, Water and the Environment assessed Origin Energy's proposal for a grid-scale Battery Energy Storage System adjacent to Eraring Power Station in NSW under the EPBC Act. The project triggered potential impacts on threatened species, specifically the Green and Golden Bell Frog (Litoria aurea—Vulnerable) in the adjacent Muddy Lake system. The Department recommended the action be declared "not a controlled action if undertaken in a particular manner" (NCA-PM), indicating that with specified conditions, the proposal would not trigger significant impacts on listed threatened species or communities under section 18 of the EPBC Act. Ministerial comments were received during assessment. The recommendation was issued within the statutory timeframe on 19 July 2021, with conditions outlined in an attached notice.

Document text

40,347 characters extracted from 17 pages

Open the PDF

The document text opens on its own page.