National Offshore Petroleum Safety and Environmental Management Authority

Report - Assessment Report - CGG - Regia MSS EP

F333-01 Released 42 pages PDF

Summary

AI-generated

Written by Claude Haiku 4.5 from the extracted text on 16 May 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

NOPSEMA assessed CGG's Regia Marine Seismic Survey (MSS) environment plan (REG-EP-030-EP, Revision 5) against regulatory criteria and recommended that the decision maker cannot be reasonably satisfied the plan meets the requirements of sub-regulation 34 of the Offshore Petroleum Greenhouse Gas Storage (Environment) Regulation 2023. The assessment examined whether the environment plan was appropriate for the nature and scale of the activity, evaluating the operational area, mitigation source area, and active source area where seismic survey activities would occur. The report details the assessment team's findings regarding the adequacy of activity descriptions, operational boundaries, and sound source deployment procedures for marine fauna protection during the proposed seismic survey operations.

Document text

163,106 characters extracted from 42 pages

Open the PDF

The document text opens on its own page.