National Offshore Petroleum Safety and Environmental Management Authority

10. A1185868 - Email CGG To NOPSEMA Re Preparation For OMR Meeting

F309-02 Released 5 pages PDF

Summary

AI-generated

Written by Claude Haiku 4.5 from the extracted text on 16 May 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

NOPSEMA engaged with CGG (operator/contractor) and Klarite in February 2025 to prepare for regulatory meetings regarding the Regia MSS (marine seismic survey) Environment Plan. The correspondence shows preparation for two meetings scheduled for early March 2025, with the first covering acceptable levels, Environmental Performance Outcomes (EPOs), and ALARP (As Low As Reasonably Practicable) assessments, and the second addressing cultural features, little penguins, and zooplankton impacts. CGG submitted preliminary questions to NOPSEMA to facilitate discussion, with particular focus on how acceptable levels for cultural values were defined in the environment plan's Appendix E1, referencing the Offshore Petroleum and Greenhouse Gas Storage Act section 280. The email chain reflects routine regulatory consultation between the operator and NOPSEMA's Regulatory Operations team regarding environmental assessment documentation.

Document text

8,161 characters extracted from 5 pages

Open the PDF

The document text opens on its own page.