National Offshore Petroleum Safety and Environmental Management Authority

Thread – Letter – Invitation to Comment – draft Conditions – Scarborough 4D MSS EP Conditions – 26.07.23

F246-10 Date not published 8 pages PDF

Summary

AI-generated

Written by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

In July 2023, NOPSEMA engaged with Woodside Energy regarding draft conditions for the Scarborough 4D Marine Seismic Survey Environment Plan. Internal email correspondence from July 25-26, 2023 shows NOPSEMA staff requesting Woodside's comments on proposed condition amendments for the seismic survey activity. Woodside provided marked-up copies of proposed condition changes and associated comments on July 26, 2023. The exchange reflects NOPSEMA's consultation process with the operator during the environment plan assessment phase for this offshore petroleum activity, though the specific content of the proposed conditions and Woodside's detailed submissions is not fully captured in the email thread summary provided.

Document text

15,291 characters extracted from 8 pages

Open the PDF

The document text opens on its own page.