National Offshore Petroleum Safety and Environmental Management Authority

A918553 – Report – NOPSEMA Inspection – 17-03-23

F218-03 Date not published 5 pages PDF

Summary

AI-generated

Written by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

NOPSEMA conducted an onshore inspection of Jadestone Energy (Eagle) Pty Ltd's Montara Venture facility from 2-7 February 2023 (Inspection No. 4790). The inspection verified compliance with General Direction 1886, issued 12 September 2022, which required specific actions before hydrocarbon production could recommence at the facility. The inspection examined the operator's safety case (MV-70-REP-F-0004 Rev.4) and relevant operational procedures. The final report was issued 17 March 2023 following internal review and consultation with the duty holder. The document includes inspection methodology, legislative framework under the Offshore Petroleum and Greenhouse Gas Storage Act 2006, and conclusions regarding compliance with permissioning requirements and associated safety risks.

Document text

9,928 characters extracted from 5 pages

Open the PDF

The document text opens on its own page.