National Offshore Petroleum Safety and Environmental Management Authority
A371496 - Report - MRIR - Woodside - Lord 3D MSS
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
Woodside Energy Ltd reported a final recordable environmental incident during seismic operations on the Polarcus Alima vessel for the Lord 3D MSS project in June 2014. On 9 June 2014, an Acoustic Ranging System Streamer Device (105 cm x 9.4 cm) equipped with a lithium battery was permanently lost during routine streamer retrieval for maintenance. The incident breached Environmental Performance Objective 5.4.3, which required no permanent loss of towed equipment during the survey. The equipment could not be recovered and was replaced. No further corrective actions or preventative measures were implemented beyond the equipment replacement.
Document text
2,348 characters extracted from 1 page
The document text opens on its own page.