National Offshore Petroleum Safety and Environmental Management Authority
A911667 - Letter from Santos to NOPSEMA with a weekly report, letter from Santos to NOPSEMA dated 1 February 2023 and a submission in relation to Barossa Gas Export Pipeline Heritage Consultancy…
Show full title
A911667 - Letter from Santos to NOPSEMA with a weekly report, letter from Santos to NOPSEMA dated 1 February 2023 and a submission in relation to Barossa Gas Export Pipeline Heritage Consultancy attached
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
Santos submitted a progress report on 3 February 2023 to NOPSEMA regarding compliance with a General Direction issued on 13 January 2023 concerning the Barossa Gas Export Pipeline Installation Environment Plan. The Direction required Santos NA Barossa Pty Ltd, SK E&S Australia Pty Ltd, and Santos Offshore Pty Ltd to undertake weekly progress reports and complete two key actions: notifying NOPSEMA of future pipeline activities at least 10 days in advance, and conducting an independent assessment to identify underwater cultural heritage places along the pipeline route that may have spiritual and cultural significance to Indigenous peoples. The progress report indicated no pipeline activities would commence within the initial 10-day period, but Santos advised it was considering conducting surveys under the pipeline installation environment plan. The submission included detailed status tracking for each Direction requirement with anticipated completion dates.
Document text
41,316 characters extracted from 23 pages
The document text opens on its own page.