National Offshore Petroleum Safety and Environmental Management Authority
Notice – Final Report – RTN File Download Receipt – 14-08-2019
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
On 13 August 2019, an operator submitted a 30-day incident report to NOPSEMA regarding a produced water pipe support failure on the Northern Endeavour offshore facility. The submission included three documents: a root cause analysis using the five whys methodology, NOPSEMA's 30-day report template, and a detailed incident description. The submission was received and logged by NOPSEMA's secure file transfer system on 14 August 2019, with the regulatory assessment period commencing the following day. This disclosure contains the file receipt confirmation and metadata rather than the substantive incident investigation findings or regulatory determinations.
Document text
1,395 characters extracted from 1 page
The document text opens on its own page.