National Offshore Petroleum Safety and Environmental Management Authority
Memo – Further information supplied by UPS
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
NOPSEMA correspondence from July 2019 regarding a shutdown event on the Northern Endeavour floating production facility operated by Upstream Production Solutions. A NOPSEMA inspector inquired about an emergency shutdown event that potentially caused vibration leading to a corroded pipe support failure in the LP flare header. The operator clarified that a controlled process shutdown (PSD) occurred rather than an emergency shutdown (EDS), meaning no facility muster or emergency systems were activated. The shutdown was triggered by a transmitter failure on the turret's common gas lift supply line downstream of gas lift compressors. Plant recovery operations commenced without issues and were substantially complete by 23:00 hours on the same day.
Document text
4,442 characters extracted from 6 pages
The document text opens on its own page.