National Offshore Petroleum Safety and Environmental Management Authority

Email Woodside To NOPTA And NOPSEMA Encl G-8-AP Calliance Meeting Pack

F340-03 Released 10 pages PDF

Summary

AI-generated

Written by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

Woodside Energy sent NOPSEMA a pre-read presentation package for a scheduled bi-monthly meeting on the G-8-AP Calliance storage formation project, held online on 16 December 2025. The email, from Woodside representative Mia Yellagongo, transmitted the presentation slides covering the Calliance Carbon Capture and Storage project's status update. The attached presentation includes standard disclaimers regarding forward-looking statements, third-party data reliability, and limitations on representations. The disclosure reflects routine regulatory engagement between the operator and NOPSEMA regarding ongoing offshore operations, with no specific compliance findings, enforcement actions, or substantive safety or environmental concerns evident in the correspondence itself.

Document text

10,299 characters extracted from 10 pages

Open the PDF

The document text opens on its own page.