National Offshore Petroleum Safety and Environmental Management Authority

Biannual Progress Report (General Direction 2016 Schedule 1 Direction 5) - 01.05.26. - redacted

F352-01 Date not published 8 pages PDF

Summary

AI-generated

Written by Claude Haiku 5.5 from the extracted text on 14 Oct 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

This biannual progress report, dated 1 May 2026, was submitted to NOPSEMA by Woodside Energy (Victoria) Pty Ltd under Direction 5 of the NOPSEMA General Direction 2016 for the Minerva gas field (VIC/L22 and VIC/PL33), off Port Campbell, Victoria. Co-titleholder Cooper Energy (MF) Pty Ltd is also named. It covers 1 October 2025 to 31 March 2026. Of the property scheduled for removal, 2.1 km of rigid flowline and umbilical bundle remains in the field, with no removal work carried out in the period. Planned removal involves cutting the pipeline into sections on the seabed, retrieving them by crane to a vessel (not yet selected) and recycling onshore. Deviations are attributed to engineering complexity of pipe bundle clamp loss controls. A revised Commonwealth environment plan is due Q3 2026, and a Campaign 2 safety case is pending vessel selection.

Document text

10,282 characters extracted from 8 pages

Open the PDF

The document text opens on its own page.