National Offshore Petroleum Safety and Environmental Management Authority
A924575 -Thread - NOPSEMA Notes Re Meeting With Eni Re Blacktip-P3 Annulus Pressure - 30.03.23
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 27 Feb 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
NOPSEMA notes from a 30 March 2023 meeting with Eni regarding the Blacktip-P3 offshore facility document operational and safety concerns. Eni provided updates on gas sampling being sent to Perth for composition and corrosivity analysis, and confirmed work on an annulus pressure management plan to be submitted circa May/June following Well Operations and Maintenance Plan (WOMP) revision. NOPSEMA raised concerns about the cement job verification process and requested additional information from Eni to address these concerns. The regulator also noted multiple unknowns requiring reduction before proceeding. A separate operational note flagged concern that the Mobile Offshore Drilling Unit could move off station before decisions were agreed with Eni, potentially limiting available remedial actions. Current operations involved well clean-up work on Blacktip P3.
Document text
2,196 characters extracted from 4 pages
The document text opens on its own page.