Department of Climate Change, Energy, the Environment and Water

Documents regarding ARENA Grant - Decarbonising the Pilbara and Beyond

83142 Released 4 pages PDF

Summary

AI-generated

Written by Claude Haiku 5.5 from the extracted text on 21 Oct 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

This release contains a single document, Schedule 1 (The Project) of an ARENA Advancing Renewables Program funding agreement for the "Decarbonising the Pilbara and Beyond" pre-FEED study (PRO-2570). It describes a planned renewable hydrogen production facility and renewable energy assets in the Pilbara, Western Australia, intended to support green iron production and decarbonise a region whose energy supply is heavily reliant on fossil fuels (around 40% of WA's Scope 1 and 2 emissions). Stated outcomes include assessing the feasibility of 100% renewable-powered electrolysis on an isolated grid. Much of the recipient, partner and subcontractor detail is withheld under sections 47G(1) and 22(1)(a)(ii). The release contains no EPBC referral, controlled action decision, offsets, species or site-level impact data, quantified emissions reductions, or departmental advice diverging from a ministerial decision.

Document text

4,684 characters extracted from 4 pages

Open the PDF

The document text opens on its own page.