National Offshore Petroleum Safety and Environmental Management Authority

Report - MRIR - Esso Australia Resources Pty Ltd

F297 Released 2 pages PDF

Summary

AI-generated

Written by Claude Haiku 4.5 from the extracted text on 27 Feb 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

Esso Australia Resources Pty Ltd submitted its Monthly Recordable Environmental Incidents report to NOPSEMA for April 2025, covering operations under three environment plans: Gippsland Basin Geophysical and Geotechnical Investigations, Bass Strait, and Jack-up Rig Plug and Abandonment. Two incidents were recorded. On 20 April, approximately 0.1 litres of hydraulic oil was released to sea from a dripping hose fitting on the Mulloway-1 jack-up rig, constituting a breach of the "no spills to environment" performance outcome. The fitting was replaced and other legs inspected; future fluorescent marking of hydraulic fittings was implemented to prevent recurrence. On 25 April, a welding blanket was knocked overboard during Bass Strait pack-up activities, breaching habitat impact limits for dropped objects. Both incidents

Document text

3,382 characters extracted from 2 pages

Open the PDF

The document text opens on its own page.