Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Documents relating to Parafield airport masterplan 2024

Document FOI 26-352 and FOI 26-353 Released 338 pages PDF

Summary

AI-generated

Written by Claude Haiku 5.5 from the extracted text on 21 Oct 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

The release concerns the Parafield Airport Master Plan 2024 in South Australia, comprising email correspondence and extracts from the draft master plan (dMP), a preliminary draft summary and a supplementary report. The correspondence from 2023 and 2026 covers departmental contacts and the Department of Climate Change, Energy, the Environment and Water's position: it has no statutory role in approving master plans, but future Major Development Plans will be referred under the EPBC Act. The plan forecasts aircraft movements rising 54%, from 221,728 in 2023 to 342,346 in 2043, with electric aircraft making up 17% of movements by 2031 and 69% by 2043. Proposed works include runway resurfacing, taxiway extensions and sealing, expanded run-up bays and apron expansion within 8- and 20-year horizons. Other extracts cover commercial precinct road access, noise management and environmental obligations. Much of the text is redacted or garbled, and the excerpt does not show cost figures or funding decisions.

Document text

590,856 characters extracted from 338 pages

Open the PDF

The document text opens on its own page.