Department of Defence

Hunter-Class Frigates' weight

342/26/27 Released 12 pages PDF

Summary

AI-generated

Written by Claude Haiku 5.5 from the extracted text on 6 Nov 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

This FOI release (Defence FOI 342/26/27) concerns the Hunter Class Frigate Project and comprises a Contract Data Requirement approval matrix for ENG-775, the Quarterly Weight Report (V31), with 9 to 21 comments categorised by severity, mostly redacted in their creator and comment fields. It also includes a BAE Systems Maritime Australia transmittal advice dated 5 March 2026, export-control release conditions, and three BAE letters (22 May, 7 July 2026) and a Defence email chain (20 July 2026) concerning weight-related matters under the SEA 5000 Phase 1 head contract. Those letters reference a June 2026 report, a 1 September 2026 date, and a 23 June 2026 meeting. Much of the body text is redacted under s47E(d), s47F and s47G, so the specific weight figures and the substance of the weight-saving and variable-load issues cannot be determined from the release.

Document text

12,253 characters extracted from 12 pages

Open the PDF

The document text opens on its own page.