Department of Defence

Darwin Airport flaring

380/26/27 Released 6 pages PDF

Summary

AI-generated

Written by Claude Haiku 5.5 from the extracted text on 13 Nov 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

The release contains three emails and a notification form concerning gas flaring at Darwin's LNG facilities, which Defence's 452 Squadron Darwin Flight and Darwin Air Traffic Control coordinated with the operators. The documents cover a Santos Darwin LNG (Wickham Point, D227) notification dated 1 August 2026 requesting a 1700 feet release height for 1 to 4 August 2026. They also include a May 2026 exchange with the Australian NOTAM Office, in which Defence sought the history of D227 NOTAMs and was told only one, issued 19 October 2025 for an unplanned gas release, appeared on record over the prior 12 months. A October 2025 Santos email requesting that NOTAM is also included. Redactions are limited to personal contact details and some names, with s47F, s47E(c) and s47E(d) exemptions applied. No cost, procurement or capability information is present, and no link to a public controversy is evident in the text.

Document text

6,832 characters extracted from 6 pages

Open the PDF

The document text opens on its own page.