This NOPSEMA investigation report (Investigation IVT12244, final revision dated 28 September 2023) concerns sustained casing pressure in the new Blacktip P3 well, operated by titleholder Eni Australia B.V. Anomalous annulus pressure of 660psi was recorded on 24 February 2023…
-
NOPS
NOPSEMA
Released
F304-A924703-9847
5 pages
PDF
This release is a single daily drilling and completion report (Report #65, dated 4 April 2023) for the Blacktip P3 well in permit WA-33-L, operated by ENI Australia B.V. using the jack-up rig Valaris 107. The report records completion operations, including well test…
-
NOPS
NOPSEMA
Released
F304-A925989
4 pages
PDF
This is a daily drilling and completions report (Report #64, dated 3 April 2023) for the Blacktip P3 well in permit WA-33-L, operated by ENI Australia B.V. using the Valaris 107 jack-up rig. The report covers well test preparations and 18-3/4" 10K BOP stump testing. It records…
-
NOPS
NOPSEMA
Released
F304-A925987
4 pages
PDF
This is a single daily drilling and completions report (Report #63, dated 2 April 2023) for the Blacktip P3 well in permit WA-33-L, operated by ENI Australia B.V. using the jack-up rig Valaris 107. The report covers Cleansorb activation work, including N2 injection to a lower…
-
NOPS
NOPSEMA
Released
F304-A925985
5 pages
PDF
This FOI release comprises a single daily drilling and completion report, number 62, dated 1 April 2023, for the Blacktip P3 well (well code 31990) in permit WA-33-L, operated by ENI Australia B.V. using the jack-up rig Valaris 107. The report records completion operations…
-
NOPS
NOPSEMA
Released
F304-A925983
4 pages
PDF
This is a single daily drilling and completion report (Report #61, dated 31 March 2023) for the Blacktip P3 well in permit WA-33-L, operated by ENI Australia B.V. using the Valaris 107 jack-up rig. The report is not a NOPSEMA assessment or enforcement document; it is the…
-
NOPS
NOPSEMA
Released
F304-A924703
4 pages
PDF
This is a single daily drilling and completion report (Report #60, dated 30 March 2023) for the Blacktip P3 well in permit WA-33-L, operated by Eni Australia B.V. using the jack-up rig Valaris 107. It records a nitrogen injectivity test and a Cleansorb treatment on the A2 upper…
-
NOPS
NOPSEMA
Released
F304-A924560
5 pages
PDF
This document is a single daily drilling and completion report (Report #59, dated 29 March 2023) for the Blacktip P3 well in permit WA-33-L, operated by ENI Australia B.V. using the Valaris 107 jack-up rig. The job is in the completion phase, with a cumulative cost of about USD…
-
NOPS
NOPSEMA
Released
F304
4 pages
PDF
NOPSEMA notes from a 30 March 2023 meeting with Eni regarding the Blacktip-P3 offshore facility document operational and safety concerns. Eni provided updates on gas sampling being sent to Perth for composition and corrosivity analysis, and confirmed work on an annulus pressure…
-
NOPS
NOPSEMA
Released
F312
50 pages
PDF
This Management of Change submission addresses an unplanned release of plastic piggyback clamps during decommissioning of the Minerva pipeline in Commonwealth and Victorian state waters. Subsea7 released approximately 186 kg of polypropylene clamps (as of May 5, 2025) while…
-
NOPS
NOPSEMA
Released
F308-A1237532
4 pages
PDF
This is a letter dated 9 July 2025 from Woodside Energy Ltd to NOPSEMA giving a status update under General Direction 831 for the Minerva field, which is in decommissioning. Woodside reports that all four Minerva wells were permanently plugged in June 2025 and that 2.9 km of the…
-
NOPS
NOPSEMA
Released
F308-A1209024
20 pages
PDF
NOPSEMA's investigation report IVT14016, dated 30 June 2025, examines the loss of plastic piggyback saddles from Woodside Energy (Victoria)'s Minerva field decommissioning and pipeline removal into the marine environment. The release began on 12 January 2025 and, across six…
-
NOPS
NOPSEMA
Released
F308
3 pages
PDF
NOPSEMA's Compliance Committee endorsed revoking and reissuing General Directions 831, 832, and 833 for Woodside's decommissioning of unnamed petroleum projects (including Minerva). The decision extends project timelines to allow safer, more thorough planning after multiple…
-
NOPS
NOPSEMA
Released
F311-A1239376
3 pages
PDF
This release is a single Monthly Environmental Incident Report form, dated 15 July 2025, submitted by Woodside Energy Scarborough Pty Ltd under the WA-61-L and WA-62-L Subsea Infrastructure Installation environment plan, covering June 2025. Two incidents are reported. On 17 and…
-
NOPS
NOPSEMA
Released
F311-A1238774
2 pages
PDF
This release is a single page from a Major Incident or Reportable Incident Report (MRIR) submitted by Woodside Burrup Pty Ltd for the Pluto Alpha Platform, a production facility, covering June 2025 under the Pluto Facility Operations Environment Plan (Revision 15). The incident…
-
NOPS
NOPSEMA
Released
F311-A1238760
1 page
PDF
This release is a Monthly Environmental Incident Report (MRIR) submitted by Woodside Energy Ltd for its Okha FPSO production facility, covering June 2025 under Revision 7 of the Okha FPSO Facility Operations Environment Plan. The single recorded incident occurred on 28 June…
-
NOPS
NOPSEMA
Released
F311-A1238759
4 pages
PDF
This document is a Monthly Environment Incident Report (MRIR) submitted by Woodside Energy Ltd for June 2025 covering production activities at the Goodwyn Alpha Platform under the Goodwyn Alpha Facility Operations Environment Plan (Rev 13). It records three incidents, all…
-
NOPS
NOPSEMA
Released
F311-A1238754
4 pages
PDF
This document is a Material Risk Incident Report (MRIR) submitted by Woodside Energy Ltd to NOPSEMA for June 2025 production operations at the North Rankin Complex Platform, under the North Rankin Complex Facility Operations Environment Plan (Rev 10). It records three incidents.…
-
NOPS
NOPSEMA
Released
F311-A1225686
19 pages
PDF
This release is a partial 30-day incident report (form N-03300-FM0831) submitted by Woodside Energy Global Pty Ltd to NOPSEMA about a release on 8 May 2025 at the decommissioned Griffin Field (WA-10-L), about 80 km north-east of Exmouth in 131 metres of water. During subsea…
-
NOPS
NOPSEMA
Released
F311-A1225532
1 page
PDF
This FOI release consists of a single covering email, dated 12 June 2025, from an operator to NOPSEMA's regulatory submissions mailbox, with a PDF attachment titled "June 2025 Griffin Flowline Event - Partial 30 Day Report". The email, marked confidential, forwards a partial…