National Offshore Petroleum Safety and Environmental Management Authority
A1313066 - File note - record of meeting with DCCEEW - handwritten notes of NOPSEMA staff - 2025-07-30
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
These are handwritten meeting notes from a NOPSEMA staff member documenting a 30 July 2025 discussion with the Department of Climate Change, Energy, Environment and Water (DCCEEW) regarding Santos' Environment Plan (EP). The meeting covered Basel Convention implementation requirements for PISO (persistent, inert, synthetic organic) disposal, with DCCEEW confirming it could assist Santos in seeking consent from receiving countries even where NESSA consent may not apply. The notes indicate an EP was accepted and made available on the NESSA website, with section 2.9.1 containing disposal information. DCCEEW acknowledged awareness of Santos' EP statement and initial consultation regarding receiving country consent requirements. The notes reference completion of an Inventory of Hazardous Materials (IHM) and ongoing DCCEEW engagement, characterizing the discussion as productive.
Document text
1,720 characters extracted from 1 page
The document text opens on its own page.