National Offshore Petroleum Safety and Environmental Management Authority

Thread – NOPSEMA and Woodside – Assessment of Scarborough Environment Plans – 4 July 2023

F246-04 Date not published 5 pages PDF

Summary

AI-generated

Written by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

Woodside Energy submitted correspondence to NOPSEMA on 4 July 2023 requesting that its response letter to the Environmental Defenders Office (dated 3 July 2023) be considered during NOPSEMA's assessment of multiple Scarborough environment plans. The four environment plans under assessment covered: a 4D B1 marine seismic survey, seabed intervention and trunkline installation, drilling and completions, and subsea infrastructure installation for the WA-61-L and WA-62-L blocks. Woodside asserted that consultation with EDO's clients and Save Our Songlines pursuant to regulation 11A of the Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009 was complete, and requested NOPSEMA include this correspondence in its decision-making materials. The document does not disclose the content of Woodside's substantive response to EDO or NOPSEMA's subsequent regulatory decision.

Document text

3,519 characters extracted from 5 pages

Open the PDF

The document text opens on its own page.