National Offshore Petroleum Safety and Environmental Management Authority
A826597 – Report – NOPSEMA Inspection – 15-02-22
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
NOPSEMA conducted an inspection of the Montara Venture facility operated by Jadestone Energy (Eagle) Pty Ltd on 3 February 2022, reviewing Safety Case MV-70-REP-F-00004 Revision 4. The inspection report documents 15 observations and findings across multiple safety-critical systems. Issues identified include blocked riser annuli vent ports (2018), failed fire dampers on multiple occasions (2019-2021), safety-critical valve failures including SDV 1371 partial stroke test failure (2020), emergency shutdown valve closure time failures (2020), pressure control valve malfunction affecting fire water systems (2020), a helifuel refueling filter separator weep (2020), and staffing/fatigue concerns raised in a worker complaint (2020). The report was finalized on 15 February 2022 and distributed to NOPSEMA records and Jadestone Energy.
Document text
31,702 characters extracted from 13 pages
The document text opens on its own page.