National Offshore Petroleum Safety and Environmental Management Authority
A909096 - Email thread between NOPSEMA and a media entity in relation to the Santos General Direction with a media release attached dated 25 January 2023
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
NOPSEMA issued a General Direction to Santos NA Barossa Pty Ltd and related entities on 13 January 2023 regarding the Barossa pipeline (NT/PL5) following a December 2022 inspection. The Direction requires Santos to conduct an assessment identifying underwater cultural heritage places along the pipeline route with potential spiritual and cultural significance to Indigenous peoples under traditional law that may be affected by activities covered by the previously accepted Barossa Pipeline Installation Environment Plan (9 March 2020). Additionally, Santos must provide NOPSEMA with at least 10 days' notice before commencing any future activities under the Environment Plan. This email thread documents NOPSEMA's media response to journalist inquiries about the Direction on 25 January 2023.
Document text
6,791 characters extracted from 4 pages
The document text opens on its own page.