National Offshore Petroleum Safety and Environmental Management Authority

A911055 - Email thread between NOPSEMA and Santos regarding ‘Santos Letter to NOPSEMA: Proposed Marine Surveys’

F198-03 Date not published 2 pages PDF

Summary

AI-generated

Written by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

In February 2023, NOPSEMA approved proposed marine survey activities by Santos associated with implementation of General Direction 1898, confirming the surveys fell within the scope of the accepted Barossa GEP Installation Environment Plan and were not constrained by Santos' previous undertaking from December 2022. NOPSEMA's Operations Team determined the described activity could proceed with General Direction 1898 in place and acknowledged Santos' notice of activity commencement under General Direction 1 and Regulation 29(1). The exchange demonstrates regulatory correspondence regarding survey scope clarification for the Barossa project.

Document text

2,670 characters extracted from 2 pages

Open the PDF

The document text opens on its own page.