A914246 - Powerpoint Presentation By Santos For A Meeting With NOPSEMA On 3 February 2023
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 27 Feb 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
Santos presented to NOPSEMA on 3 February 2023 regarding its Gas Export Pipeline (GEP) project, covering installation plans, proposed environmental surveys, and stakeholder consultation. Santos' Environment Plan (Revision 3), accepted in March 2020 and expiring March 2025, indicated pipeline installation was expected between Q3 2021 and Q2 2023, taking up to nine months. The company proposed surveys to support a General Direction assessment, with notifications provided three weeks before the first survey scheduled during a planned Tiwi Islands visit (6-10 February). Santos stated proposed vessel-based surveys would not impact heritage values due to no seabed contact. The meeting also addressed feedback on General Direction weekly reports, an EDO (Environmental Defenders Office) letter received 2 February, and a draft GEP inspection report. Timing considerations included NPF fishing seasons (1 April-15 June
Document text
1,505 characters extracted from 4 pages
The document text opens on its own page.