National Offshore Petroleum Safety and Environmental Management Authority
Final - Notice - Issue Letter & Report - IVT13204 - 31-05-2024_rendition_Redacted
Summary
AI-generatedWritten by Claude Haiku 5.5 from the extracted text on 14 Oct 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
This release comprises a covering email and letter from NOPSEMA, dated 31 May 2024, issuing a final investigation report (IVT13204) into a rolled ankle or foot injury at the Goodwyn Alpha facility, operated by Woodside Energy Ltd. The injury occurred on 9 May 2024 when a worker, avoiding crane operations, stepped onto a structural beam about 640mm above the deck and slipped or tripped to the deck below. The person was treated onboard and medevaced to Karratha Health Campus. NOPSEMA opened a level 2 investigation on 14 May 2024. Its inspectors concluded there was no immediate risk to personnel, the incident was under control, and Woodside had begun an internal investigation and a facility-wide review of similar deviation risks. The investigation team recommended closing the investigation. Names of the lead investigator and team are redacted.
Document text
8,475 characters extracted from 6 pages
The document text opens on its own page.