National Offshore Petroleum Safety and Environmental Management Authority

Final - Submission - Final Report - 03-06-2024_rendition_Redacted

F354-02 Date not published 8 pages PDF

Summary

AI-generated

Written by Claude Haiku 5.5 from the extracted text on 14 Oct 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

This release is a full and final Form FM0831 incident report, submitted by Woodside Energy Ltd to NOPSEMA on 3 June 2024 (event WELEV24050040). It concerns an accident at the Goodwyn A Platform on the North West Shelf, Western Australia, during combined normal operations and turnaround activity. On 9 May 2024 at about 14:18, a contract project technician (Contract Resources) stepped onto a 230mm-wide structural steel beam 640mm above the deck, then slipped or tripped to the deck below, fracturing and dislocating the right foot. The man was medevaced to Karratha Health Campus. The root cause was recorded as obstruction of a designated walkway by a temporary crane boom rest structure. Corrective action is a hard barricade due 6 June 2024. No environmental impact, loss of containment or regulatory enforcement is recorded. Several personal details are included, and parts of the form are redacted.

Document text

12,941 characters extracted from 8 pages

Open the PDF

The document text opens on its own page.