National Offshore Petroleum Safety and Environmental Management Authority

Subsea 7 Incident Summary Notification - Saddle Dislodged - 2025-01-12_Redacted

F327-05 Date not published 14 pages PDF

Summary

AI-generated

Written by Claude Haiku 5.5 from the extracted text on 14 Oct 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

This document is a Subsea 7 Incident Summary Notice, not a NOPSEMA regulatory document, covering an environmental marine debris incident on 12 January 2025 during dredging at KP9 on the Woodside-operated Minerva Field decommissioning project. A white plastic saddle (under 100mm x 100mm) was seen floating after becoming dislodged, possibly by dredging equipment or dredger water pressure. Recovery was judged unsafe and impracticable. The company rated the actual consequence as slight, with a severity level 2 under the Woodside EP. Around 1000 plastic saddles, some over 20 years old, remain subsea, and cutting activities pose a risk of further losses. Corrective actions included reminders to report debris, procurement of a 7-metre telescopic net pole, and a planned cutting alignment session. No NOPSEMA enforcement action is recorded.

Document text

11,248 characters extracted from 14 pages

Open the PDF

The document text opens on its own page.