National Offshore Petroleum Safety and Environmental Management Authority

Subsea 7 and Woodside email - First saddle loss during cutting - 2025-05-04_Redacted

F327-13 Date not published 1 page PDF

Summary

AI-generated

Written by Claude Haiku 5.5 from the extracted text on 14 Oct 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

This release is a single email, dated 4 March 2025, from a Subsea 7 representative to Woodside and other recipients, with one attached photograph. The email reports that a plastic saddle detached during cut 21 at 1514 hours on 4 March 2025. The cut was made about 0.5 metres from the saddle using shear cutters, and the saddle could not be recovered despite visual surface presence. Subsea 7 says it will log the event on its hazard register and that future planned cuts will aim for at least 1 metre clearance from saddles. The document contains no NOPSEMA assessment, compliance finding or enforcement action, and the recipients' names are redacted.

Document text

1,717 characters extracted from 1 page

Open the PDF

The document text opens on its own page.