Risk assessment documents for Russell two office, level 6 (EST08953) 1969/25/26 – Documents
Summary
AI-generatedWritten by Claude Haiku 5.5 from the extracted text on 21 Oct 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
This FOI release comprises risk assessment material for the Russell Offices Building 2, Level 6 fit-out (project EST08953), prepared by consultant Jacobs for the 50% Schematic Design stage, with the Project Risk Register (Appendix B) and a Safety in Design Report issued 15 November 2024. The risk registers, spanning around 33 numbered risks across project, design and operational categories, cover delivery delays from the approval and Accreditation Authority process (a six-month accreditation period is allowed), contractor insolvency, construction-market constraints, long-lead furniture and ICT equipment, temporary accommodation, and security incidents during construction. Many hazard descriptions, controls and cost-related entries are heavily redacted under s47E(d) and s47F, so the financial exposure is largely not visible. The safety section rates construction hazards such as falls from height and live electrical connections as extreme or very high before mitigation. No specific budget figures are shown in the excerpt.
Document text
38,403 characters extracted from 22 pages
The document text opens on its own page.