Documents related to Russell two office, level 6 project (EST08953)
Summary
AI-generatedWritten by Claude Haiku 5.5 from the extracted text on 6 Nov 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
This Defence FOI release contains part of the 50% Schematic Design Report (Volume 1) by Jacobs for the EST08953 Office Accommodation Pilot in Level 6 of the Russell Building R2, Canberra, including its BCA/DDA/MFPE compliance report and sections on mechanical services, heritage and ESD. It records that the FLOC option was selected to progress, that a ROM Cost Report (presented 25 September 2024) showed a cost increase, and that scope was reduced under CASG and Sponsor direction at UCM2 on 17 October 2024. Scope changes requested through stakeholder workshops are tabulated, along with an engagement schedule running to 25 November 2024. Heavy redaction is evident throughout, with many scope items, room references and cost-related passages masked under exemption codes 47E(d), 47E(s) and 47F. No specific cost totals or completion dates appear in the visible text.
Document text
102,020 characters extracted from 36 pages
The document text opens on its own page.