Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Minutes of meetings held by the Melbourne Airport Rail Link (MARL) Steering Committee between 01 July 2025 and 10 March 2026

Document IR 26-284 Released 27 pages PDF

Summary

AI-generated

Written by Claude Haiku 5.5 from the extracted text on 16 Oct 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

The release contains minutes of Melbourne Airport Rail Link (MARL) Steering Committee meetings held between 1 July 2025 and 10 March 2026, with the document text heavily garbled by reversed-character extraction. Most substantive pages have been withheld in full under sections 47B(a) and 47B(b) of the FOI Act, which concern commercial information, covering pages 26-28, 50-54, 100-104, 107-108 and 178-181. The one legible item is a "MARL Principles of Engagement" paper setting a joint stakeholder vision for a world-class airport rail link and station. Its minimum design criteria include seamless, accessible and weather-protected connections from train to terminals, compliance with rail and airport safety and regulatory requirements, and value-for-money design, delivery and operations. No schedule, cost, delay or risk figures are legible in the released text.

Document text

5,955 characters extracted from 27 pages

Open the PDF

The document text opens on its own page.