Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts
Business Case For The Madden Grove Burnley Level Crossing Removal.
Summary
AI-generatedWritten by Claude Haiku 4.5 from the extracted text on 27 Feb 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.
A feasibility study for removing the Madden Grove level crossing in Burnley, Victoria, prepared by the Level Crossing Removal Authority in August 2021. The document examines transport context, land use, environmental considerations, and utilities affecting the site on the Glen Waverley Line. It presents a needs assessment, evaluates multiple project concepts through multi-criteria assessment, and incorporates stakeholder views. The study recommends shortlisted concepts including Rail Concept B involving Burnley Junction reconfiguration, and identifies integrated development opportunities, changes to Loyola Grove roundabouts, and golf course redevelopment potential. It outlines key project approvals and next steps required for implementation. The document was jointly prepared by the Victorian and Australian government departments responsible for transport infrastructure.
Document text
10,003 characters extracted from 56 pages
The document text opens on its own page.