EDU
Education
Released
D24-3138453
26 pages
PDF
No summary yet: this release has not been processed
-
ARC
ARC
Released
20240701
No document available
No summary: no document is available for this release
-
NOPS
NOPSEMA
Date not published
F317-01
8 pages
PDF
This FOI release is a Biannual Progress Report dated 1 November 2025, submitted by Woodside Energy (Victoria) Pty Ltd on behalf of the titleholders (including Cooper Energy (MF) Pty Ltd) under Direction 5 of NOPSEMA's General Direction 2016. It covers decommissioning of the…
-
NOPS
NOPSEMA
Date not published
F327-16
1 page
PDF
This extract is a short fragment from a Woodside incident record titled "Environment Risk Assessment" dated 12 January 2025, marked as a first-priority event and now closed (reference WELEV25010052). It contains only the environment section of a risk assessment form. The actual…
-
NOPS
NOPSEMA
Date not published
F327-15
2 pages
PDF
This document is a Woodside Energy Group "First Priority" event investigation report (reference WELEV25010052) for the Minerva Field, under the Minerva Decommissioning business unit. It is not a NOPSEMA regulatory document as such, though it concerns an offshore petroleum…
-
NOPS
NOPSEMA
Date not published
F327-14
23 pages
PDF
This release contains correspondence between NOPSEMA and Woodside Energy concerning a draft investigation report (IVT14016) into plastic saddle clamps lost to the marine environment during decommissioning of the Minerva pipeline in Commonwealth waters. Woodside's 3 June 2025…
-
NOPS
NOPSEMA
Date not published
F327-13
1 page
PDF
This release is a single email, dated 4 March 2025, from a Subsea 7 representative to Woodside and other recipients, with one attached photograph. The email reports that a plastic saddle detached during cut 21 at 1514 hours on 4 March 2025. The cut was made about 0.5 metres from…
-
NOPS
NOPSEMA
Date not published
F327-12
2 pages
PDF
This release is a single email from a Subsea 7 representative, based in Perth, to NOPSEMA-related recipients (names redacted), with a subject line referring to saddle loss communications between Subsea 7 and Woodside. The email reports that during shear cutting work subsea, a…
-
NOPS
NOPSEMA
Date not published
F327-11
5 pages
PDF
This document is a Woodside Energy monthly recordable environment incident notification, covering April 2025, for decommissioning of the Minerva Pipeline (VIC/L22, Pipeline Licence VIC-PL33) under the Minerva Decommissioning and Field Management (State) Environment Plan. It…
-
NOPS
NOPSEMA
Date not published
F327-10
7 pages
PDF
This is a Woodside Energy internal file note dated 24 March 2025 concerning the ALARP (as low as reasonably practicable) assessment for pipe cutting during decommissioning of the Minerva facilities, offshore Victoria. It reproduces an excerpt from the Minerva decommissioning…
-
NOPS
NOPSEMA
Date not published
F327-09
1 page
PDF
This FOI release is a single meeting record from a NOPSEMA and Woodside meeting held on 20 May 2025, made in support of the IVT14016 investigation. It notes that NOPSEMA set out the legislative context, inspection objectives and scope, and asked questions on each element, with…
-
NOPS
NOPSEMA
Date not published
F327-08
6 pages
PDF
This FOI release comprises a spreadsheet-style register titled "Lost Saddle Clamp Assessment", tracking missing, broken and lost saddle clamps and cut pieces associated with pipeline installation and cutting work, mainly from January to April 2025 and referencing field joint…
-
NOPS
NOPSEMA
Date not published
F327-07
6 pages
PDF
This Woodside Energy file note, dated 28 March 2025, sets out an internal engineering assessment for decommissioning the Minerva field's 10km offshore pipeline. It was prepared to satisfy Performance Standard 9.1 of the Commonwealth and State environment plans, which requires…
-
NOPS
NOPSEMA
Date not published
F327-06
16 pages
PDF
This is a 16-slide Woodside Energy presentation to NOPSEMA dated 10 April 2025, titled "Minerva Decommissioning: Engagement with NOPSEMA" and marked confidential. It covers progress on removing the Minerva field infrastructure in Commonwealth and state waters, with pipeline…
-
NOPS
NOPSEMA
Date not published
F327-05
14 pages
PDF
This document is a Subsea 7 Incident Summary Notice, not a NOPSEMA regulatory document, covering an environmental marine debris incident on 12 January 2025 during dredging at KP9 on the Woodside-operated Minerva Field decommissioning project. A white plastic saddle (under 100mm…
-
NOPS
NOPSEMA
Date not published
F327-04
1 page
PDF
This release is a single-page Initial Incident Notification from contractor Subsea7 concerning the Woodside Minerva project at the Seven Sisters worksite. It records an incident on 12 January 2025 at about 09:30 hours, reported to the client at 10:00 hours, classified as…
-
NOPS
NOPSEMA
Date not published
F327-03
104 pages
PDF
This FOI release comprises an email chain between NOPSEMA and Woodside Energy (Victoria) Pty Ltd, with attached EPA Victoria notifiable incident form NFI-00003791, a monthly recordable report to DEECA, a lost saddle register, and related recovery records. The correspondence…
-
NOPS
NOPSEMA
Date not published
F327-02
3 pages
PDF
This release is a Start of Activity notification, sent by Woodside Energy (Victoria) Pty Ltd to a regulatory submissions mailbox on 17 December 2024, under the Minerva Decommissioning and Field Management Environment Plans for Commonwealth and State waters. It advises that…
-
NOPS
NOPSEMA
Date not published
F327-01
4 pages
PDF
Woodside Energy (Victoria) Pty Ltd's March 2025 monthly recordable environment incident notification, submitted under the Minerva Decommissioning and Field Management Environment Plan, concerns decommissioning of the Minerva Pipeline (VIC/L22, Pipeline Licence VIC-PL33) in…
-
NOPS
NOPSEMA
Date not published
F348-06
2 pages
PDF
This FOI release is a single email dated 10 April 2026 from the Department of Climate Change, Energy, the Environment and Water (DCCEEW) to NOPSEMA, with an attached advice request. The email concerns the Browse to North West Shelf Development proposal (EPBC 2018/8319), a…