NOPS
NOPSEMA
Date not published
F196-17
6 pages
PDF
This NOPSEMA submission contains a final report documenting a produced water pipe support failure on the Laminaria Pioneer (LP) facility. The report includes photographic evidence of structural deterioration, showing significant pipe movement and lowering caused by layered…
-
NOPS
NOPSEMA
Date not published
F196-16
4 pages
PDF
A 5 Whys incident investigation report documents a near-miss event involving a produced water pipe support failure on an offshore facility's cargo deck. On 4 July 2019, during high-pressure water blasting of corrosion remediation work on the Orchard Road Bridge structure, an…
-
NOPS
NOPSEMA
Date not published
F196-15
6 pages
PDF
NOPSEMA released a final report documenting a produced water pipe support failure on the Laminaria Platform (LP). The report contains photographic evidence of structural deterioration, including layered corrosion on pipe supports, pipe movement and lowering, and strain on main…
-
NOPS
NOPSEMA
Date not published
F196-14
12 pages
PDF
On 30 June 2019, a pipe support dropped from the LP flare line at the Northern Endeavour facility (Timor Sea) operated by Upstream Production Solutions. The incident was verbally notified to NOPSEMA on 1 July 2019 at 20:00 hours CST, with a written report submitted on 10 August…
-
NOPS
NOPSEMA
Date not published
F196-13
1 page
PDF
NOPSEMA issued a follow-up memo on 8 August 2019 regarding two outstanding Dangerous Occurrence final reports from the Northern Endeavour NOGA floating production facility. The incidents involved dropped objects: a pipe support bracket that fell on deck (notified 1 July 2019…
-
NOPS
NOPSEMA
Date not published
F196-12
2 pages
PDF
On 7 July 2019, Upstream Production Solutions submitted a three-day incident report to NOPSEMA concerning a dangerous occurrence involving a pipe support failure that occurred on the Northern Endeavour facility on 4 July 2019. The submission was made by the Acting Offshore…
-
NOPS
NOPSEMA
Date not published
F196-11
12 pages
PDF
On 4 July 2019, a pipe support failure occurred at the Northern Endeavour facility in the Timor Sea (operated by Upstream Production Solutions). The incident was verbally notified to NOPSEMA on 4 July at 19:30 hrs (CST) and a written initial report was submitted on 6 July 2019.…
-
NOPS
NOPSEMA
Date not published
F196-10
14 pages
PDF
On 7 July 2019, Upstream Production Solutions submitted a mandatory 3-day report to NOPSEMA regarding a dangerous occurrence on the Northern Endeavour offshore installation that occurred on 4 July 2019. The incident involved pipe support failure. The submission was made by the…
-
NOPS
NOPSEMA
Date not published
F196-09
8 pages
PDF
I cannot provide a meaningful summary of this FOI disclosure because the document consists entirely of image files without accompanying text or captions that identify their content, context, or relevance. While the title indicates this is "Photo Evidence" submitted to NOPSEMA…
-
NOPS
NOPSEMA
Date not published
F196-08
2 pages
PDF
This document contains technical specifications and piping and instrumentation diagrams for offshore petroleum processing equipment, including fuel gas distribution systems, compressors, separators, coolers, and pressure safety valves. The as-built drawings are dated March 2016…
-
NOPS
NOPSEMA
Date not published
F196-07
7 pages
PDF
A NOPSEMA submission documents a dropped object incident involving a 5.7kg flare pipe support that fell from approximately 4 metres above deck on 30 June 2019. The document includes photographic evidence of the suspected impact location on deck, the position where the operator…
-
NOPS
NOPSEMA
Date not published
F196-06
1 page
PDF
This document is a file download receipt confirming NOPSEMA received additional information submissions related to a dropped object incident on 4 July 2019. The submission included two PDF documents: an incident report (SNE-Office-19070114570.pdf, 355 KB) and a dropped object…
-
NOPS
NOPSEMA
Date not published
F196-05
1 page
PDF
This email transmission from July 2019 documents NOPSEMA's receipt of additional information relating to a dropped object incident on the Northern Endeavour offshore facility. The submission comprises two attachments: a summary report on a dropped object involving the LP flare…
-
NOPS
NOPSEMA
Date not published
F196-04
12 pages
PDF
On 30 June 2019, a pipe support dropped from the LP Flare Line at the Northern Endeavour facility in the Timor Sea (operated by Upstream Production Solutions). The incident was verbally reported to NOPSEMA on 1 July 2019 at 20:00 hrs CST. This report classifies the occurrence as…
-
NOPS
NOPSEMA
Date not published
F196-03
1 page
PDF
On 1 July 2019, the Northern Endeavour offshore facility submitted an initial dangerous occurrence report to NOPSEMA documenting a dropped object incident involving a pipe support on the low-pressure flare line that occurred on 30 June 2019. The submission, classified as an OHS…
-
NOPS
NOPSEMA
Date not published
F196-02
1 page
PDF
On 1 July 2019, an operator submitted a dangerous occurrence report to NOPSEMA concerning the Northern Endeavour facility, detailing a dropped object incident involving a pipe support on the low-pressure flare line. The submission was received and processed through NOPSEMA's…
-
NOPS
NOPSEMA
Date not published
F196-01
1 page
PDF
This internal NOPSEMA memo documents a dropped object incident notification involving a pipe support found on an offshore facility deck. The object fell during early Saturday hours with no resulting injuries or equipment damage. The operator had already submitted a required…
-
NOPS
NOPSEMA
Date not published
F198-19
3 pages
PDF
Santos submitted correspondence to NOPSEMA on 15 February 2023 regarding the Barossa Gas Export Pipeline Installation, referencing the accepted Environment Plan (Revision 3) from March 2020. The letter followed two meetings between Santos and NOPSEMA representatives on 3 and 7…
-
NOPS
NOPSEMA
Date not published
F198-18
6 pages
PDF
Email correspondence between Santos and NOPSEMA regarding a meeting scheduled for 3 February 2023. Santos requested to remove drilling from the agenda and later provided a draft agenda covering gas export pipeline installation updates, General Direction assessment surveys, Tiwi…
-
NOPS
NOPSEMA
Date not published
F198-17
5 pages
PDF
NOPSEMA internal email from February 2023 documents notes from a quarterly strategic decommissioning meeting with Santos. The discussion covered Santos' consultation approach for decommissioning and operational activities, conducted on a geographical basis with initial…