-
INFR
Infrastructure
Date not published
Document FOI 26-082—part 1 (3.35 MB)…
22 pages
PDF
This FOI release contains 73 pages of documents from July 2024 to September 2025 responding to a broad request about misconduct, corruption, and unlawful conduct on Commonwealth-funded infrastructure projects in Victoria. The disclosure includes correspondence regarding concerns…
-
INFR
Infrastructure
Date not published
FOI 24-053
No document available
This FOI disclosure log from the Department of Infrastructure covers releases from July to December 2023. The documents encompass a diverse range of departmental matters including: supplementary budget estimates briefs for rural and regional affairs; correspondence regarding…
-
INFR
Infrastructure
Date not published
Document FOI 25-296 and FOI 25-297…
395 pages
PDF
The Department released Senate Estimates briefs prepared for the Environment and Communications Legislation Committee on 25 February 2025. The disclosure includes 24 documents covering communications and media policy matters, with most granted in full access under section 22 of…
-
NOPS
NOPSEMA
Date not published
F051
2 pages
PDF
NOPSEMA's investigation summary documents a hydrocarbon release incident at Woodside Energy's CWLH OKHA FPSO on 7 October 2011. A fire and gas detection system activated following a small gas release in a pressure vessel breaker, triggering emergency response procedures and…
-
NOPS
NOPSEMA
Date not published
F058
1 page
PDF
In September 2012, Transocean submitted an initial incident notification to NOPSEMA regarding a dangerous occurrence at the Jack Bates offshore facility. The submission, made via email on 27 September 2012, indicated a potential fatality and was accompanied by a formal…
-
NOPS
NOPSEMA
Date not published
F114
2 pages
PDF
This FOI disclosure contains 73 redacted incident and enforcement reports from NOPSEMA relating to the Ichthys Development Project operated by INPEX Ichthys Pty Ltd, covering two floating production facilities: Ichthys Explorer and Ichthys Venturer. The documents include…
-
NOPS
NOPSEMA
Date not published
F184
No document available
No summary: no document is available for this release
-
NOPS
NOPSEMA
Date not published
F195
4 pages
PDF
NOPSEMA internal correspondence from July 2019 regarding urgent safety concerns at the Northern Endeavour NOGA floating production, storage and offloading (FPSO) facility. Two corrosion-related dropped object incidents were reported within days of each other: Notification 6019…
-
NOPS
NOPSEMA
Date not published
F196
1 page
PDF
NOPSEMA's OHS Regulatory Specialist sent a memo on 6 July 2019 notifying colleagues of an upcoming meeting at UPS offices to discuss dropped object incidents involving the Northern Endeavour facility. The memo indicates two separate dropped object notifications would be…
-
NOPS
NOPSEMA
Date not published
F198
4 pages
PDF
Santos presented to NOPSEMA on 3 February 2023 regarding its Gas Export Pipeline (GEP) project, covering installation plans, proposed environmental surveys, and stakeholder consultation. Santos' Environment Plan (Revision 3), accepted in March 2020 and expiring March 2025…
-
NOPS
NOPSEMA
Date not published
F201
3 pages
PDF
This email thread from May 2019 involves NOPSEMA staff discussing regulatory issues related to the Northern Endeavour facility and the Laminaria and Corallina offshore fields. The correspondence addresses whether relocating the Northern Endeavour within Australian jurisdiction…
-
NOPS
NOPSEMA
Date not published
F202
4 pages
PDF
NOPSEMA issued General Direction No. 1897 to Enfield riser turret mooring (RTM) registered holders requiring fortnightly monitoring and reporting of the Nganhurra RTM through decommissioning. As of 17 March 2023, the RTM remained afloat with a draft of 75.8 metres, navigation…
-
NOPS
NOPSEMA
Date not published
F205
5 pages
PDF
Santos submitted its 16th weekly progress report to NOPSEMA on 4 May 2023 in response to a General Direction issued 13 January 2023 under section 574 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006. The Direction, issued to Santos NA Barossa Pty Ltd, SK E&S…
-
NOPS
NOPSEMA
Date not published
F207
1 page
PDF
Woodside Energy reported a dropped objects incident during drilling and completions operations at the Persephone field in September 2016. On 14 September, a fairlead pin and grating fell to the seabed from the Ocean Apex MODU during anchor pretensioning operations. The incident…
-
NOPS
NOPSEMA
Date not published
F213
17 pages
PDF
NOPSEMA and the Australian Maritime Safety Authority (AMSA) collaborated on a discussion paper addressing regulatory jurisdiction over floating storage and off-take (FSO) and floating production, storage and off-take (FPSO) vessels in Commonwealth offshore areas. The paper…
-
NOPS
NOPSEMA
Date not published
F214
95 pages
PDF
NOPSEMA assessed an Environment Plan submitted by Woodside Energy Scarborough Pty Ltd for a 4D baseline marine seismic survey of the Scarborough field in the Northern Carnarvon Basin. The proposed activity involves new 3D seismic surveying across multiple permit areas (WA-61-L…
-
NOPS
NOPSEMA
Date not published
F218
7 pages
PDF
NOPSEMA conducted an inspection of the Montara Venture facility operated by Jadestone Energy (Eagle) Pty Ltd on 27-28 April 2023 (onshore only). The inspection, numbered 4794, reviewed compliance against the Montara Operations Safety Case (Revision 4, dated May 2020) and…
-
NOPS
NOPSEMA
Date not published
F226
6 pages
PDF
NOPSEMA conducted an occupational health and safety inspection of Shell Australia's Prelude FLNG facility from September to October 2019 following a complaint that contractor Monadelphous Engineering Associates had mobilised rope access technicians without valid competency…
-
NOPS
NOPSEMA
Date not published
F228
No document available
No summary: no document is available for this release
-
NOPS
NOPSEMA
Date not published
F232
No document available
No summary: no document is available for this release