Skip to content
FOI Monitor
Menu
Search Agencies About

Quotes find a phrase, "fuel security". An asterisk finds prefixes, treas*. Searches titles, summaries and the full text of every document.

4,655 releases

Filter
Agency
Show all 59 agencies
Released
Document
  1. NOPS NOPSEMA Date not published

    Submission - Initial Report - Pipe Support Failure - 06-07-2019

    F196-11 12 pages PDF

    On 4 July 2019, a pipe support failure occurred at the Northern Endeavour facility in the Timor Sea (operated by Upstream Production Solutions). The incident was verbally notified to NOPSEMA on 4 July at 19:30 hrs (CST) and a written initial report was submitted on 6 July 2019.…

  2. NOPS NOPSEMA Date not published

    Submission - Initial Report Header - 06-07-2019

    F196-10 14 pages PDF

    On 7 July 2019, Upstream Production Solutions submitted a mandatory 3-day report to NOPSEMA regarding a dangerous occurrence on the Northern Endeavour offshore installation that occurred on 4 July 2019. The incident involved pipe support failure. The submission was made by the…

  3. NOPS NOPSEMA Date not published

    Submission - Photo Evidence

    F196-09 8 pages PDF

    I cannot provide a meaningful summary of this FOI disclosure because the document consists entirely of image files without accompanying text or captions that identify their content, context, or relevance. While the title indicates this is "Photo Evidence" submitted to NOPSEMA…

  4. NOPS NOPSEMA Date not published

    Submission - Initial report additional information - SNE-Office-19070114570

    F196-08 2 pages PDF

    This document contains technical specifications and piping and instrumentation diagrams for offshore petroleum processing equipment, including fuel gas distribution systems, compressors, separators, coolers, and pressure safety valves. The as-built drawings are dated March 2016…

  5. NOPS NOPSEMA Date not published

    Submission - Initial report additional information - Dropped Object Summary - LP Flare Pipe Support

    F196-07 7 pages PDF

    A NOPSEMA submission documents a dropped object incident involving a 5.7kg flare pipe support that fell from approximately 4 metres above deck on 30 June 2019. The document includes photographic evidence of the suspected impact location on deck, the position where the operator…

  6. NOPS NOPSEMA Date not published

    Memo - File Download Receipt for initial report additional information to sender - 04-07-2019

    F196-06 1 page PDF

    This document is a file download receipt confirming NOPSEMA received additional information submissions related to a dropped object incident on 4 July 2019. The submission included two PDF documents: an incident report (SNE-Office-19070114570.pdf, 355 KB) and a dropped object…

  7. NOPS NOPSEMA Date not published

    Submission - Initial report additional information - Secure File - 04-07-2019

    F196-05 1 page PDF

    This email transmission from July 2019 documents NOPSEMA's receipt of additional information relating to a dropped object incident on the Northern Endeavour offshore facility. The submission comprises two attachments: a summary report on a dropped object involving the LP flare…

  8. NOPS NOPSEMA Date not published

    Submission - Initial report - Pipe Support Dropped Object LP Flare Line

    F196-04 12 pages PDF

    On 30 June 2019, a pipe support dropped from the LP Flare Line at the Northern Endeavour facility in the Timor Sea (operated by Upstream Production Solutions). The incident was verbally reported to NOPSEMA on 1 July 2019 at 20:00 hrs CST. This report classifies the occurrence as…

  9. NOPS NOPSEMA Date not published

    Submission - Initial report - Dropped object - 01-07-2019

    F196-03 1 page PDF

    On 1 July 2019, the Northern Endeavour offshore facility submitted an initial dangerous occurrence report to NOPSEMA documenting a dropped object incident involving a pipe support on the low-pressure flare line that occurred on 30 June 2019. The submission, classified as an OHS…

  10. NOPS NOPSEMA Date not published

    Memo - File Download Receipt for Initial Report to sender - 02-07-2019

    F196-02 1 page PDF

    On 1 July 2019, an operator submitted a dangerous occurrence report to NOPSEMA concerning the Northern Endeavour facility, detailing a dropped object incident involving a pipe support on the low-pressure flare line. The submission was received and processed through NOPSEMA's…

  11. NOPS NOPSEMA Date not published

    Memo – Focal Point initial notification

    F196-01 1 page PDF

    This internal NOPSEMA memo documents a dropped object incident notification involving a pipe support found on an offshore facility deck. The object fell during early Saturday hours with no resulting injuries or equipment damage. The operator had already submitted a required…

  12. NOPS NOPSEMA Date not published

    A914244 - Letter from Santos to NOPSEMA dated 15 February 2023 in relation to the Barossa Gas Export Pipeline Installation

    F198-19 3 pages PDF

    Santos submitted correspondence to NOPSEMA on 15 February 2023 regarding the Barossa Gas Export Pipeline Installation, referencing the accepted Environment Plan (Revision 3) from March 2020. The letter followed two meetings between Santos and NOPSEMA representatives on 3 and 7…

  13. NOPS NOPSEMA Date not published

    A911928 - Email thread between Santos and NOPSEMA in relation to a proposed Santos Meeting on Friday 3 February 2023

    F198-18 6 pages PDF

    Email correspondence between Santos and NOPSEMA regarding a meeting scheduled for 3 February 2023. Santos requested to remove drilling from the agenda and later provided a draft agenda covering gas export pipeline installation updates, General Direction assessment surveys, Tiwi…

  14. NOPS NOPSEMA Date not published

    A915336 - NOPSEMA internal email thread documenting notes from a quarterly meeting with Santos

    F198-17 5 pages PDF

    NOPSEMA internal email from February 2023 documents notes from a quarterly strategic decommissioning meeting with Santos. The discussion covered Santos' consultation approach for decommissioning and operational activities, conducted on a geographical basis with initial…

  15. NOPS NOPSEMA Date not published

    A916151 - Email from Santos to NOPSEMA with a letter from Santos to NOPSEMA dated 24 February 2023 and Weekly Report #6 attached

    F198-16 7 pages PDF

    Santos submitted its sixth weekly progress report to NOPSEMA on 24 February 2023 regarding compliance with General Direction 1898, issued 13 January 2023 under the Offshore Petroleum and Greenhouse Gas Storage Act 2006. The Direction was issued to Santos NA Barossa Pty Ltd, SK…

  16. NOPS NOPSEMA Date not published

    A914581 - Email from Santos to NOPSEMA with a letter from Santos to NOPSEMA dated 17 February 2023 and Weekly Report #5 attached

    F198-15 8 pages PDF

    Santos submitted its fifth weekly progress report to NOPSEMA on 17 February 2023 regarding compliance with a General Direction issued on 13 January 2023 under the Offshore Petroleum and Greenhouse Gas Storage Act 2006. The Direction, issued to Santos NA Barossa Pty Ltd, SK E&S…

  17. NOPS NOPSEMA Date not published

    A912899 - Email from Santos to NOPSEMA with a letter from Santos to NOPSEMA dated 10 February 2023 and a Weekly Report #4 attached

    F198-14 8 pages PDF

    On 10 February 2023, Santos submitted Weekly Report #4 to NOPSEMA regarding the Barossa Gas Export Pipeline Installation Environment Plan, pursuant to a General Direction issued 13 January 2023 under section 574 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006. The…

  18. NOPS NOPSEMA Date not published

    A911667 - Letter from Santos to NOPSEMA with a weekly report, letter from Santos to NOPSEMA dated 1 February 2023 and a submission in relation to Barossa Gas Export Pipeline Heritage Consultancy…

    F198-13 23 pages PDF

    Santos submitted a progress report on 3 February 2023 to NOPSEMA regarding compliance with a General Direction issued on 13 January 2023 concerning the Barossa Gas Export Pipeline Installation Environment Plan. The Direction required Santos NA Barossa Pty Ltd, SK E&S Australia…

  19. NOPS NOPSEMA Date not published

    A909625 - Email from Santos to NOPSEMA with an attached letter from Santos to NOPSEMA dated 27 January 2023 and the Weekly Report #2

    F198-12 8 pages PDF

    Santos submitted its second weekly progress report to NOPSEMA on 27 January 2023 regarding compliance with a General Direction issued on 13 January 2023 under the Offshore Petroleum and Greenhouse Gas Storage Act 2006. The Direction, applicable to the Barossa Gas Export Pipeline…

  20. NOPS NOPSEMA Date not published

    A908366 - Email thread between NOPSEMA and Santos with an attached letter from Santos to NOPSEMA dated 20 January 2023 and ‘Weekly Report # 1’

    F198-11 10 pages PDF

    This email thread documents Santos submitting its first weekly report to NOPSEMA on 20 January 2023 regarding the Barossa Gas-to-Electricity Platform (GEP) installation, in compliance with Direction 1898—an enforcement action issued by NOPSEMA. The correspondence shows NOPSEMA's…

Showing 4,481 to 4,500 of 4,655

Previous 1 … 224 225 226 … 233 Next page

FOI Monitor indexes documents published on the FOI disclosure logs of 44 Australian Government agencies, extracts their text and adds an AI-written summary. Everything links back to the agency that released it.

Last checked 20 Oct 2026, 06:11 AEDT. Most recent release 20 Oct 2026.

About Methodology Copyright and compliance Status Privacy RSS GitHub Contact