Skip to content
FOI Monitor
Menu
Search Agencies About

Quotes find a phrase, "fuel security". An asterisk finds prefixes, treas*. Searches titles, summaries and the full text of every document.

4,599 releases

Filter
Agency
Show all 59 agencies
Released
Document
  1. NOPS NOPSEMA Date not published

    Submission – General Direction No. 1897 – Enfield RTM Fortnightly Report – 2023-03-17 A921245 - Submission - General Direction No. 1897 - Enfield RTM Fortnightly Report - 2023-03-17 (a928045)

    F202 4 pages PDF

    NOPSEMA issued General Direction No. 1897 to Enfield riser turret mooring (RTM) registered holders requiring fortnightly monitoring and reporting of the Nganhurra RTM through decommissioning. As of 17 March 2023, the RTM remained afloat with a draft of 75.8 metres, navigation…

  2. NOPS NOPSEMA Date not published

    A932714 - Thread - General Direction 1898 - Santos To NOPSEMA Weekly Report #16 - 05 May 2023

    F205 5 pages PDF

    Santos submitted its 16th weekly progress report to NOPSEMA on 4 May 2023 in response to a General Direction issued 13 January 2023 under section 574 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006. The Direction, issued to Santos NA Barossa Pty Ltd, SK E&S…

  3. NOPS NOPSEMA Date not published

    A520099 - Report - MRIR - Woodside Energy - Persephone Drilling And Subsea Installation Activities - Drilling And Completions

    F207 1 page PDF

    Woodside Energy reported a dropped objects incident during drilling and completions operations at the Persephone field in September 2016. On 14 September, a fairlead pin and grating fell to the seabed from the Ocean Apex MODU during anchor pretensioning operations. The incident…

  4. NOPS NOPSEMA Date not published

    Email Thread – Correspondence Between Nopsema, AMSA And DISR Regarding Fpso’s And Fso’s

    F213 17 pages PDF

    NOPSEMA and the Australian Maritime Safety Authority (AMSA) collaborated on a discussion paper addressing regulatory jurisdiction over floating storage and off-take (FSO) and floating production, storage and off-take (FPSO) vessels in Commonwealth offshore areas. The paper…

  5. NOPS NOPSEMA Date not published

    A1011528 – Assessment 6780 – Assessment Findings

    F214 95 pages PDF

    NOPSEMA assessed an Environment Plan submitted by Woodside Energy Scarborough Pty Ltd for a 4D baseline marine seismic survey of the Scarborough field in the Northern Carnarvon Basin. The proposed activity involves new 3D seismic surveying across multiple permit areas (WA-61-L…

  6. NOPS NOPSEMA Date not published

    A931063 – Report – NOPSEMA Inspection – 03-05-23

    F218 7 pages PDF

    NOPSEMA conducted an inspection of the Montara Venture facility operated by Jadestone Energy (Eagle) Pty Ltd on 27-28 April 2023 (onshore only). The inspection, numbered 4794, reviewed compliance against the Montara Operations Safety Case (Revision 4, dated May 2020) and…

  7. NOPS NOPSEMA Date not published

    Report – Planned Inspection – September 2019 – Prelude FLNG

    F226 6 pages PDF

    NOPSEMA conducted an occupational health and safety inspection of Shell Australia's Prelude FLNG facility from September to October 2019 following a complaint that contractor Monadelphous Engineering Associates had mobilised rope access technicians without valid competency…

  8. NOPS NOPSEMA Date not published

    7 December 2023

    F228 No document available

    No summary: no document is available for this release

  9. NOPS NOPSEMA Date not published

    2 January 2024

    F232 No document available

    No summary: no document is available for this release

  10. NOPS NOPSEMA Date not published

    NTF11969 – Incident Details

    F233 6 pages PDF

    Woodside Energy Ltd notified NOPSEMA of a dangerous occurrence at the CWLH OKHA FPSO on 31 December 2022, when a hawser rope failed during offtake operations. The equipment failure occurred as the offtake vessel was making fast within the 70-metre safety zone in rough but…

  11. NOPS NOPSEMA Date not published

    Assessment Findings – 6801 – Scarborough Drilling And Completions Environment Plan

    F238 138 pages PDF

    NOPSEMA assessed Woodside Energy Scarborough Pty Ltd's Drilling and Completions Environment Plan (Assessment ID 6807) for the Scarborough petroleum activity. The assessment examined source control arrangements and worst-case discharge scenarios under OPGGS(S) regulations.…

  12. NOPS NOPSEMA Date not published

    Report – Statement Of Reasons – Scarborough 4D MSS EP – 31 July 2023

    F246 49 pages PDF

    NOPSEMA accepted, subject to conditions, the Scarborough 4D B1 Marine Seismic Survey Environment Plan submitted by Woodside Energy on 31 July 2023. The plan authorizes a three-dimensional/baseline 4D marine seismic survey in the Northern Carnarvon Basin, approximately 188 km…

  13. IA Infrastructure Australia Date not published

    IA FOI 13-07—partial Release Leach Highway Fremantle Upgrade, Funding Application Submissions And Supporting Documents.

    13-07 No document available

    No summary: no document is available for this release

  14. IA Infrastructure Australia Date not published

    IA FOI 13-02—full Release All Documents Submitted By The ACT Government To Infrastructure Australia And Any Assessment Or Advice Given By Infrastructure Australia To The ACT Government In Response To…

    13-02 No document available

    No summary: no document is available for this release

  15. IA Infrastructure Australia Date not published

    IA FOI 14-03—partial Release The Missing Appendices And Any And All Documents Relating To The Business Case For The Sunshine Coast Airport Master Plan November 2009 And Any And All Documents Relating…

    14-03 No document available

    No summary: no document is available for this release

  16. IA Infrastructure Australia Date not published

    IA FOI 13-09—partial Release Documents In Relation To The Oakajee Mid-West Development Project, In Particular Documents Recording Infrastructure Australia's Consideration And Assessment For The…

    13-09 No document available

    No summary: no document is available for this release

  17. IA Infrastructure Australia Date not published

    IA FOI 13-10—partial Release Documents In Relation To The Pilbara Integrated Power Solution, In Particular Documents Recording Infrastructure Australia's Consideration And Assessment Of The Pilbara…

    13-10 No document available

    No summary: no document is available for this release

  18. IA Infrastructure Australia Date not published

    IA FOI 15-01—partial Release Briefs Or Reports Prepared For Incoming Chief Executive Officer Philip Davies, Prior To Or The Time Of His Commencement In The Role Of Ceo.

    15-01 No document available

    No summary: no document is available for this release

  19. IA Infrastructure Australia Date not published

    IA FOI 15-04—partial Release All Correspondence Received From The Western Australian Government Relating To The “12 Shortlisted Options” Referred To In Page 3 Of The Perth Freight Link Project…

    15-04 No document available

    No summary: no document is available for this release

  20. IA Infrastructure Australia Date not published

    IA FOI 15-02—partial Release Documents Comprising Communications Between Infrastructure Australia And The Western Australian Departments Of Transport And Main Roads Which Specifically Relate To The…

    15-02 No document available

    No summary: no document is available for this release

Showing 4,561 to 4,580 of 4,599

Previous 1 … 228 229 230 Next page

FOI Monitor indexes documents published on the FOI disclosure logs of 43 Australian Government agencies, extracts their text and adds an AI-written summary. Everything links back to the agency that released it.

Last checked 20 Oct 2026, 06:11 AEDT. Most recent release 20 Oct 2026.

About Methodology Copyright and compliance Status Privacy RSS GitHub Contact