NOPS
NOPSEMA
Date not published
F195-05
15 pages
PDF
Upstream Production Solutions provided NOPSEMA with additional information following an inspection, including a dropped object (PDO) register and mitigation measures in response to a dropped object incident on 30 June 2019 at the Northeast facility. The memo, dated 8 July 2019…
-
NOPS
NOPSEMA
Date not published
F195-04
10 pages
PDF
NOPSEMA conducted an occupational health and safety inspection of the Northern Endeavour NOGA facility operated by Upstream Production Solutions Pty Ltd on 8 July 2019. The inspection report, issued 10 July 2019, documents findings from OHS inspectors and was distributed to the…
-
NOPS
NOPSEMA
Date not published
F195-03
3 pages
PDF
NOPSEMA correspondence from July 2019 concerning a dropped object incident reported by operator Upstream Production Solutions at the Northern Endeavour floating production facility. The initial notification was received by NOPSEMA's Assessment & Inspection team, who requested…
-
NOPS
NOPSEMA
Date not published
F195-01
1 page
PDF
NOPSEMA staff circulated an internal memo in July 2019 regarding a meeting to discuss safety incidents involving the Northern Endeavour floating production facility operated by UPS. The memo indicates NOPSEMA was investigating dropped object incidents reported on 30 June 2019…
-
NOPS
NOPSEMA
Date not published
F196-31
3 pages
PDF
NOPSEMA correspondence regarding a dropped object incident on the Northern Endeavour facility operated by Upstream Production Solutions. The object dropped 5.9 meters and weighed 5.7 kilograms, with NOPSEMA identifying it as a serious hazard with potential fatality risk.…
-
NOPS
NOPSEMA
Date not published
F196-30
6 pages
PDF
NOPSEMA correspondence from July 2019 regarding a shutdown event on the Northern Endeavour floating production facility operated by Upstream Production Solutions. A NOPSEMA inspector inquired about an emergency shutdown event that potentially caused vibration leading to a…
-
NOPS
NOPSEMA
Date not published
F196-29
15 pages
PDF
Following a dropped object incident on 30 June 2019 at the North Rankin Complex (NE), Upstream Production Solutions submitted additional information to NOPSEMA detailing their Potential Dropped Object (PDO) mitigation actions. The company engaged rope access inspectors for a…
-
NOPS
NOPSEMA
Date not published
F196-28
2 pages
PDF
NOPSEMA's Compliance Committee reviewed a short-notice inspection of Upstram Production Services' Northern Endeavour NOGA FPSO facility conducted on 8 July 2019, following two corrosion-related dropped object incidents. Notification 6019 (30 June) involved a 5.7 kg object…
-
NOPS
NOPSEMA
Date not published
F196-27
3 pages
PDF
On 10 July 2019, NOPSEMA issued a Prohibition Notice to Upstream Production Solutions (UPS), operator of the Northern Endeavour offshore production facility in the Timor Sea (550 km northwest of Darwin), requiring cessation of hydrocarbon production due to corrosion issues…
-
NOPS
NOPSEMA
Date not published
F196-26
10 pages
PDF
NOPSEMA conducted an Occupational Health and Safety inspection of the Northern Endeavour - NOGA floating production facility operated by Upstream Production Solutions Pty Ltd on 8 July 2019. The inspection report was issued on 10 July 2019 and distributed to the operator and…
-
NOPS
NOPSEMA
Date not published
F196-25
4 pages
PDF
NOPSEMA internal correspondence from July 2019 regarding the Northern Endeavour NOGA FPSO facility documents regulatory responses to serious safety incidents involving dropped objects caused by corroded pipe supports. Two incidents occurred in late June and early July 2019, with…
-
NOPS
NOPSEMA
Date not published
F196-24
1 page
PDF
NOPSEMA's final report (RMS ID 6027) from August 2019 addresses a failed produced water pipe support on an unnamed offshore petroleum facility. The document constitutes internal correspondence transmitting the completed investigation findings. While the excerpt provides limited…
-
NOPS
NOPSEMA
Date not published
F196-23
1 page
PDF
On 13 August 2019, an operator submitted a 30-day incident report to NOPSEMA regarding a produced water pipe support failure on the Northern Endeavour offshore facility. The submission included three documents: a root cause analysis using the five whys methodology, NOPSEMA's…
-
NOPS
NOPSEMA
Date not published
F196-22
2 pages
PDF
On 2 July 2019, NOPSEMA prepared an internal memo to serve as an initial report to a focal point regarding offshore petroleum regulatory matters. The document references RMS reference number 6019 and includes attachments (A680247 and A680246), though the specific content of…
-
NOPS
NOPSEMA
Date not published
F196-21
2 pages
PDF
This July 2019 memo from NOPSEMA provides additional information regarding an initial report filed with a focal point, with four associated reference documents (A680889, A680892, A680885, A680896). The memo appears to be part of NOPSEMA's regulatory communication processes…
-
NOPS
NOPSEMA
Date not published
F196-20
1 page
PDF
NOPSEMA received a 30-day accident and dangerous occurrence report from Northern Endeavour on 10 August 2019 concerning a dropped object incident involving a pipe support on the low-pressure flare line. The submission was electronically delivered through NOPSEMA's secure file…
-
NOPS
NOPSEMA
Date not published
F196-19
1 page
PDF
This July 2019 internal NOPSEMA memo reports an occupational health and safety incident at the Northern Endeavour offshore facility involving a pipe support on a redundant water line that became suspended during blasting activities in the area. The memo directs attention to…
-
NOPS
NOPSEMA
Date not published
F196-18
12 pages
PDF
On July 4, 2019, a pipe support failure occurred at the Northern Endeavour facility in the Timor Sea, operated by Upstream Production Solutions. NOPSEMA received verbal notification on July 4 at 19:30 (CST) and a written incident report on August 13, 2019. The incident was…
-
NOPS
NOPSEMA
Date not published
F196-17
6 pages
PDF
This NOPSEMA submission contains a final report documenting a produced water pipe support failure on the Laminaria Pioneer (LP) facility. The report includes photographic evidence of structural deterioration, showing significant pipe movement and lowering caused by layered…
-
NOPS
NOPSEMA
Date not published
F196-16
4 pages
PDF
A 5 Whys incident investigation report documents a near-miss event involving a produced water pipe support failure on an offshore facility's cargo deck. On 4 July 2019, during high-pressure water blasting of corrosion remediation work on the Orchard Road Bridge structure, an…