National Offshore Petroleum Safety and Environmental Management Authority

12 June 2023 submitted via submissions portal – EM – Environment Plan Assessment ID 6780 – Scarborough Seismic EP

F246-02 Date not published 2 pages PDF

Summary

AI-generated

Written by Claude Haiku 4.5 from the extracted text on 10 Jul 2026. It can miss or misread redacted and scanned pages. Check the source before relying on it.

Woodside Energy submitted Revision 7 of its Scarborough 4D Multi-Sensor Seismic (MSS) Environment Plan to NOPSEMA on 12 June 2023. The submission corrected and updated several sections, including removal of non-adjacent Native Title claims and determinations from Table 4-17, removal of non-overlapping marine protected areas from Table 4-18, and alignment of supporting text in sections 4.10.1.4 and 4.10.1.5 with the revised tables. Section 6.2 was updated to remove reference to an Extent Report and replace it with general text. The submission included highlighted and clean versions of the environment plan, with highlighting indicating new or substantially changed paragraphs in sections 4.10.1, 5.1-5.8, and updated consultation details in Tables 5-4 and 5-5 compared to earlier revisions.

Document text

2,340 characters extracted from 2 pages

Open the PDF

The document text opens on its own page.